TUGSAS A.S.
KUTAHYA FERTILIZER PRODUCTION COMPLEX
II. GAS UNIT
MANUFACTURE & INSTALLATION of ELECTROSTATIC FILTRATION PLANT

Total Construction Area :  
Information about the work  :  
Total Investment Value :  
Cost of Mechanical Works :  
Mechanical Works Manpower :  
Scope of Work :

- Manufacture & Installation of Complete Body
- Gas Canal System and Manufacture & Installation of Water Locks
- High Voltage System and Installation
- Pump Station Assurance and Installation
- Complete Power and Control System and Installation

References :    

CONSTRUCTION PERIOD: 1985