MARDAN PALACE
HOTEL MECHANICAL WORKS
KUNDU - ANTALYA |
Total Construction Area (closed / total) |
:
|
165,000 / 295,000 m2 |
Information About the Work
|
:
|
529 hotel rooms and 2 presidential suites
15 CIP villas (60 rooms)
5 VIP villas (10 rooms)
1 private villa
1250 beds in total
24,000 m2 pool
Sultan's Golden Horn Gondola
SPA, Hair-Dresser, Fitness Center
Offices, Grand Bazaar, Multi-Purpose Rooms, Small Theaters |
Total Investment Value
|
:
|
1,500,000,000 USD |
Cost of Mechanical Works
|
:
|
17,000,000 USD |
Mechanical Works Manpower
|
:
|
600,000 man-hour
|
Scope of Work
|
:
|
- Heating and Chilling Systems
Boilers (3050 kW x 3), Chilling Towers
(3500 kW x 3),
Chillers (1250 kW + 3870 kW x 2), FCU (1250 units),
Pumps (450 units)
Floor Heating Systems
- Ventilating and Air Conditioning Systems
Air Handling Units (90 units), VAV and
CAV Units,
Smoke Exhaust and Stair Pressurization
- Plumbing Systems
Domestic Water, Waste Water and Storm Water Systems, SPA Thalasso System,
Underground Drainage System,
Kitchen Plumbing System
Heat Exchangers and Accumulation Tanks
- Laundry Equipment
Steam Generator (1500 kg x 2)
- Fire Protection System
Sprinkler System
Fire Hose Cabinets
Hydrant System |
References
|
:
|
--
--
|
|
|
CONSTRUCTION PERIOD:
APRIL 2006 - FEBRUARY 2009 |
 |
|
 |
 |
 |
 |
|
 |
 |
 |
 |
|
|
|